The Panel
Most homes need a 40- or 50-amp breaker on a 200-amp panel. A photo of your breaker box tells us if you have space — or if a panel upgrade is in the way.
Chicago · Chicagoland · Surrounding Suburbs
Home garages, outdoor driveways, and commercial lots. We pull the city permit. Most home jobs finish the same day on site. Upload a photo of your panel and parking spot — we estimate from that.
Homes
Level 2, 240-volt charging for Tesla and every other EV. Attached garage, detached garage, or a weatherproof unit on the house wall by the driveway.
Business
Level 2 workplace and customer charging. Multi-stall pads, conduit, load, and permits — one licensed team from the electrical room to the stall.
What You Need To Know
Most homes need a 40- or 50-amp breaker on a 200-amp panel. A photo of your breaker box tells us if you have space — or if a panel upgrade is in the way.
Cost follows the feet from the panel to the parking spot. A charger on the garage wall next to the panel is the fastest job. A detached garage or driveway run is longer.
Chicago and most suburbs require an electrical permit. We file it with city hall and meet the inspector. You do not babysit the village.
Once the permit is in, most home garage installs are done in a single day. Fast, clean, labeled, tested.
Tesla Wall Connector, universal NACS/J1772, or the unit you already bought. We install what you drive.
We point you to available ComEd and Illinois incentives when they apply. The install is permitted and inspection-ready so rebates are not blocked.

1) The open breaker panel. 2) The garage wall or driveway spot where the charger will live. Those two pictures, plus the address, are what we use to quote.
Easy Intake